New Basement and seismic retrofit, NOPA District SF
New basement installed in three story building. Excavated 233 cubic yards of dirt and shored up the building. Installed 10 ft high shotrete retaining walls, structural I-beams, and seismically retrofitted. Installed new furnace and water heater. Installed waterproofing and drainage.